Construction progress
1. 7. 2017
Photos of the completed project (july)
7. 12. 2016
Photos of the completed project (december)
17. 10. 2016
Photos of the completed project (october)
4. and 5. 10. 2016
Final works just before the final approval of the project.
8. 9. 2016
Final works on terraces and laying a lock pavement.
25. 8. 2016
Final works on the interiors + terraces and balconies.
9. 8. 2016
The installing floating floors and finishing work of balcony.
21. 7. 2016
The installing weatherization and interior tiles.
8. 7. 2016
Laying interior tiles and sanitation.
15. 6. 2016
Laying underfloor heating and interior tiles.
1. 6. 2016
Flood testing and final works on the facade.
20. 5. 2016
Final works on the facade.
9. 5. 2016
The works on the facade continue.
2. 5. 2016
Moulding anhydrite floors and areal distribution networks.
25. 4. 2016
Moulding anhydrite floors, finishing facades.
6. 4. 2016
The works on facades and building insulation.
24. 3. 2016
The works on facades and the installation of waterproofing inside the atrium continue.
19. 3. 2016
The construction continues with facades work and the installation of waterproofing inside the atrium.
3. 3. 2016
The installing of windows is almost completed. The works continue with building partition walls.
26. 2. 2016
The installing of windows in the third and fourth floors has been started.
18. 2. 2016
Rough construction is completed!
5. 2. 2016
The installing of windows continues.
29. 1. 2016
The installing of windows in the second floor has been started.
26. 1. 2016
Finishing works on the fifth floor.
21. 1. 2016
The construction continues with finishing works on the fifth floor and the installing of windows in the first floor has been started.
11. 1. 2016
Construction of the fifth floor above ground continues.
29. 12. 2015
We have begun the construction of the fifth floor.
21. 12. 2015
The fourth floor is almost complete.
7. 12. 2015
We are finishing the third floor and we have begun the construction of the fourth floor
20. 11. 2015 and 22. 11. 2015
Construction of the third floor above ground continues
10. 11. 2015
We are finishing the second floor and we have begun the construction of the third floor
2. 11. 2015
We are finishing the second floor and we have begun the construction of the third floor
22. 10. 2015
Construction of the second floor above ground continues
14. 10. 2015
Reinforcing and boarding of the second floor
8. 10. 2015
Construction of the first floor above ground continues
1. 10. 2015
Reinforcing and boarding of the first floor
17. 9. 2015
Concreting of the first floor and atrium
31. 8. 2015
Formwork and reinforcement of the first underground floor
24. 8. 2015
Concreting of the first underground floor
3. 8. 2015
Concreting of the second underground floor
24. 7. 2015
Unique photos of construction from the bird's eye view
22. 7. 2015
Formwork and reinforcement of the second underground floor
9. 7. 2015
The second crane on the construction site
30. 6. 2015
The first crane on the construction site
25. 6. 2015
Reinforcement of the base plate of garages and section C4 - 2nd underground floor, assembly of building crane, casting of the concrete base section C3 and C2
22. 6. 2015
Concreting of the base plate (sections D1 and D2)
16. 6. 2015
Reinforcement of the base plate section D1 and D2 - 2nd underground floor
8. 6. 2015
Start the construction of our project
17. 4. 2015
Excavation work successfully continues
9. 4. 2015
Building construction pit
19. 3. 2015
Excavation works
16. 2. 2015
Building construction pit - drilling of stilts
20. 1. 2015
Demolition of current objects - underground floors
19. 12. 2014
Demolition work almost finished
25.11.2014
Demolition continues
14.11.2014
Demolition of current objects
25.10.2014
Demolition of current objects on our ground in Kobylisy was started.